Mer bilder från en onsdag i och kring verkstaden i Mariefred.
Det var dags för viss omflyttning av fordon mellan verkstad och vagnhall.
More pictures from a Wednesday in and outside the workshop in Mariefred:
– The carriage Stafsjö Rly No. 3 was taken out to the wagon shed efter finished painting.
– The hydraulic crane wagon was shortly in the workshop for the scheduled overhaul and safety inspection.
– The carriage Jönköping – Gripenbergs Rly No. 10 is beeing painted.
– Work with the axle bearings for the Mallet-locomotive No. 5 HAMRA
– The snow plow came in to get the scheduled overhaul and inspection.